Street Paving Schedule

The following areas of the Borough are included in the paving list for 2020:

  • Lincoln Street (Logan to Bypass)
  • Beverly Road (Lincoln to N. 31st)
  • Westerly Road (Beverly to N. 31st)
  • 31st Street (Market to Logan)
  • Circle Place (Beverly to Terminus)
  • October Drive (April to September)
  • S. 36th Street (March to Trindle)
  • Small Area at Compost Facility
  • Summit Ave (Base Repair Only)